15.09.20 Cefn Dinas (SO 129 964)
LIDAR image of Cefn Dinas (SO 129 964) |
The rain that had started when I was with John Watkins making place-name enquiries for the hill now listed as Square Field (SJ 070 031) was intermittently falling. This felt refreshing when I waited beside a gate for Alex to scamper up Pen y Gaer (SJ 067 014), but by the time we parked below Crasty Frain (SO 109 983) the rain was heavier, and as Alex headed up the narrow lane to the gate giving access toward the summit I sat in the car with a boiled egg sandwich and a packet of crisps. Alex was soon back and we now headed toward Moelywigoedd farm. I’d recently visited this farm and met Ian Jerman who took me to the summit of his hill, we had exchanged email addresses and after processing the Trimble data I’d sent him the height of his hill and a couple of photographs of him on top. Prior to this visit I’d emailed him and asked permission for Alex to visit, he’d replied in the affirmative, and although he was out working on the land when we arrived, I talked with his sister and as Alex headed up the hill I waited beside the car for his return.
Alex arriving back after visiting Crasty Frain (SO 109 983) |
Parking above the village beside the track that directed us upward toward the summit, we followed it as it swung rightward and continued around the southern flank of the hill. As it did so, we continued on a green track to a gate which gave access to a steepening field that was adjacent to the field where the summit was positioned.
The steepening field leading toward the summit of Cefn Dinas |
Alex at the summit of Cefn Dinas |
Gathering data at the summit of Cefn Dinas |
Survey Result:
Cefn Dinas (significant name change)
Summit Height: 221.3m (converted to OSGM15, Trimble GeoXH
6000)
Summit Grid Reference: SO 12992 96463 (Trimble GeoXH 6000)
Bwlch Height: 176.6m (LIDAR)
Bwlch Grid Reference: SO 13331 96892 (LIDAR)
Drop: 44.7m (Trimble GeoXH 6000 summit and LIDAR
bwlch)
Dominance: 20.18% (Trimble GeoXH 6000 summit and LIDAR
bwlch)
For further details please consult the Trimble Survey Spreadsheet
No comments:
Post a Comment